  [ River Tame Structures and Earthworks ]
   

Cost: £9.6m
Customer: Network Rail

£9.6m contract for the four-tracking of the West Coast Main Line near Tamworth

The first contract in a series of civil engineering schemes associated with the four-tracking of 14 miles of route on the Trent Valley section of the West Coast Main Line between Tamworth and Armitage in Staffordshire.

The two year programme of works is to be completed in June 2007 and involves the construction of new and replacement structures at the River Tame site to allow for the accommodation of a four-track railway.

A new superstructure is being built parallel to the existing River Tame Bridge (UB86) with the tracks being diverted onto it, after which the original bridge will be demolished.

Works also include widening UB 85, widening of the existing brick flood arches either side of the River Tame Bridge, extension on both sides to an existing culvert including all associated earthworks and drainage.

 


Zero Harm
  Birse Rail’s goal is to achieve Zero Harm across its business by 2012. This means:

• Zero deaths
• Zero injuries to the public
• Zero ruined lives among all
  our people

More about
Zero Harm >>
[ Other projects ]

East Midlands Parkway >>
Nuneaton Remodelling and Resignalling Project (Phase 2) >>
Western Territory Reactive Earthworks Framework >>
Merthyr Vale Frequency Enhancements >>
Underbridge 39, Sutton Park >>
River Tame Structures and Earthworks >>
Cherwell Valley Resignalling Phase 1 >>
Whitemoor Depot >>
Bristol Parkway >>
WCRM - Level Crossing Replacements >>
Civils Framework Agreement >>
Rugeley Eastern Bypass (Contract 2) >>

   A Balfour Beatty Company
   © 2006 Birse Rail ltd ®. All rights reserved. Company Registration Number 4319685 England

Site created by [technical direct]